You are here:

Estimating Slope and Level Change in N = 1 Designs
ARTICLE

, ,

Behavior Modification Volume 34, Number 3, ISSN 0145-4455

Abstract

The current study proposes a new procedure for separately estimating slope change and level change between two adjacent phases in single-case designs. The procedure eliminates baseline trend from the whole data series before assessing treatment effectiveness. The steps necessary to obtain the estimates are presented in detail, explained, and illustrated. A simulation study is carried out to explore the bias and precision of the estimators and compare them to an analytical procedure matching the data simulation model. The experimental conditions include 2 data generation models, several degrees of serial dependence, trend, and level and/or slope change. The results suggest that the level and slope change estimates provided by the procedure are unbiased for all levels of serial dependence tested and trend is effectively controlled for. The efficiency of the slope change estimator is acceptable, whereas the variance of the level change estimator may be problematic for highly negatively autocorrelated data series. (Contains 4 tables and 3 figures.)

Citation

Solanas, A., Manolov, R. & Onghena, P. (2010). Estimating Slope and Level Change in N = 1 Designs. Behavior Modification, 34(3), 195-218. Retrieved December 16, 2019 from .

This record was imported from ERIC on April 19, 2013. [Original Record]

ERIC is sponsored by the Institute of Education Sciences (IES) of the U.S. Department of Education.

Copyright for this record is held by the content creator. For more details see ERIC's copyright policy.

Keywords